TechBuild by BizPulse AI
Protect Project Margins Before Costs Get Out of Control.
TechBuild is construction intelligence for contractors. See cost variance earlier, spot where profit is leaking, and turn site updates into clear, reviewable records.
Dashboards on this page use simulated data for illustration. Demos are by request.
Construction challenges
Why margins slip on otherwise well-run projects
Most overruns do not arrive all at once. They build up in places that are hard to see in time.
Margin erodes quietly
Overtime, rework and price swings add up before the monthly report shows it.
Cost data arrives late
Site activity reaches the finance team days or weeks after the money is spent.
Site records are manual
Daily logs, safety notes and handovers are typed up from memory at the end of a long shift.
Drawings and field work drift apart
Teams work from different versions, and coordination issues surface on site.
Capabilities
Four areas that protect the bottom line
- 1
Margin preservation
A financial baseline per project, with early signals when the forecast moves away from it.
- 2
Cost control
Cost lines monitored against budget, with alerts when variance crosses a threshold you set.
- 3
Jobsite and field sync
Voice-memo daily logs, weather capture and shift safety handovers for site teams.
- 4
Integration gateway
A planned Procore REST API connection, so field and cost data can flow between systems.
Financial command center
One view of contract, cost and margin
The key figures for a project, side by side: what you were paid for, what you planned to spend, and where the forecast now sits.
- Contract value
- ₹1,00,00,000
- Budgeted cost
- ₹80,00,000
- Actual cost to date
- ₹50,00,000
- Estimated gross profit
- ₹16,00,000Budgeted: ₹20,00,000
- Estimated gross margin
- 16.0%Budgeted: 20.0%
Cost position
- Actual to date: ₹50,00,000
- Budgeted total: ₹80,00,000
- Forecast at completion (bar end): ₹84,00,000
Profit Leakage Radar
See where margin is slipping away
The radar highlights the cost patterns that most often erode profit, ranked by estimated impact.
Labour overtime drift
₹70,000Overtime hours are running above the planned level on the concrete crew.
Spot rebar procurement variance
₹1,80,000Recent spot purchases were priced above the budgeted rate.
Equipment idle hours
₹60,000Hired equipment sat idle on several shifts while waiting on prerequisite work.
Cost variance detection
Alerts when a cost line crosses your threshold
Cost lines are compared with budget. In this example, a forecast more than 5% over budget is flagged, and a draft RFI and a notification to the project lead are prepared for review.
| Cost line | Budget | Forecast | Variance | Status |
|---|---|---|---|---|
| EarthworkDivision 31 | ₹6,00,000 | ₹6,00,000 | 0.0% | Within threshold |
| Structural concreteDivision 03 | ₹24,00,000 | ₹25,50,000 | +6.3% | Over threshold |
| Metals (rebar and steel)Division 05 | ₹18,00,000 | ₹19,80,000 | +10.0% | Over threshold |
| MEPDivisions 21-28 | ₹14,00,000 | ₹14,00,000 | 0.0% | Within threshold |
| Subcontractor labourVarious | ₹18,00,000 | ₹18,70,000 | +3.9% | Within threshold |
Example alerts
Structural concrete is forecast +6.3% against budget. A draft RFI and a notification to the project lead are ready for review.
Metals (rebar and steel) is forecast +10.0% against budget. A draft RFI and a notification to the project lead are ready for review.
Jobsite workflows
Site records without the end-of-day paperwork
Give superintendents a faster way to capture what happened on site.
Daily logs
Record progress, labour and issues for the shift in a consistent format.
Voice memos
Speak a site update and have it transcribed into a draft log entry for review.
Weather capture
Conditions recorded alongside the log for later reference.
Safety handovers
Pass open safety items from one shift to the next without loose notes.
“Level 2 slab pour completed this morning. Rebar delivery for Level 3 arrives tomorrow.”
- Weather
- 31 °C, wind 12 km/h
- Safety handover
- 2 open items
- A-101 Level 1 planRevision C issued to siteCurrent
- S-201 Column layoutRevision B issued to siteCurrent
- M-310 Services routingPossible conflict with beam at gridline 4Clash review
- E-120 Power distributionConflict cleared in last coordination meetingResolved
Drawings and field coordination
Keep the site and the drawings in step
Show which drawing revision is current and whether coordination issues, such as services clashing with structure, are open or resolved.
Integration gateway
Planned, not yet availableA planned Procore REST API connection
We are designing a gateway to connect TechBuild with Procore using OAuth 2.0 and the Procore REST API. It is not yet connected to any Procore account. We will announce it only once it is built and verified.
Project specs and drawings
Keep field teams on current documents.
Cost control
Exchange budget and cost information with your project record.
Site daily observations
Send approved daily-log entries to the project record.
AI workflow orchestration
From a site update to a reviewed record
An illustrative workflow showing how a field event could move through TechBuild. A person approves before anything is sent onward. Integration with your ERP is planned, not available.
- Step 1
Voice memo
A superintendent records a site update.
- Step 2
Transcription
The memo becomes a structured draft log.
- Step 3
Variance check
Reported quantities are compared with budget.
- Step 4
RFI draft
If a threshold is crossed, a draft is prepared for review.
- Step 5
Owner review
A person approves before anything leaves the system.
Who it's for
Built for the office and the site
Contractor executives and CFOs
Portfolio-level visibility of margin and early warning on cost overruns.
Project managers
Track each project's cost position against its baseline and act sooner.
Superintendents and field engineers
Faster daily logs, safety handovers and clearer links between drawings and site work.
See how TechBuild could work for your projects
Tell us about your projects and we will arrange a walkthrough.
FAQ
TechBuild questions
Is the dashboard on this page real?
No. The figures, alerts and project name are simulated to show how TechBuild is designed to present information. They are not from a real project or customer.
Does TechBuild connect to Procore today?
Not yet. A Procore REST API integration using OAuth 2.0 is planned. We will say clearly when it is available and verified.
Does TechBuild update in real time?
We do not claim real-time synchronisation. How often data updates will depend on the sources connected for your project, which we will discuss in a demo.
Can it guarantee better margins?
No. TechBuild is designed to surface cost variance and site information earlier. What your team does with it determines the result.
How do I see TechBuild?
Request a demo through the contact form. Tell us about your projects and we will arrange a walkthrough.